Royal Bournemouth Hospital Generator Installation
10 July 2023
In May of 2022 we completed the delivery and installation package of a 3mW – V20 – 3500hp Generator and ancillaries into the new purposely built Energy Centre at the Royal Bournemouth Hospital.
In May of 2022 we completed the delivery and installation package of a 3mW – V20 – 3500hp Generator and ancillaries into the new purposely built Energy Centre at the Royal Bournemouth Hospital.
Our Scope Of Works For This Project:
- The lifting operations and both the hospital and the engineering facility where the generator was factory tested.
- The road transport of all components and equipment.
- The generator and ancillaries setting out and positioning within the new building
- The installation of ancillaries and equipment as per specifications.
- The steel erection and modifications to support the primary and secondary silencers.
We supply a full works phase plan, drawings, risk assessments, and method statements to all our projects. If there’s a project we can assist you with, please feel free to get in touch.