Birmingham Hospital Generator Removal

10 July 2023
We completed the removal of a 375kva canopied generator from within a first floor plant room on the 11th July 2022.
Image

We completed the removal of a 375kva canopied generator from within a first floor plant room on the 11th July 2022.

Our Scope Of Works For This Project:

  • Removal of redundant fuels
  • Structural dismantling
  • Removal of old fuel storage tanks
  • temporary works platform
  • Removal of the generator from the plant room
  • Lifting Operations (Hiab / Lorry Loader) 
  • Road Transport

This project presented multiple logistical and planning challenges along the way due to the location of the works, structural impediments, various stakeholders requiring business as usual during the course of these works, the design and build of the temporary platform.