Case Studies

Culvert Clearance Project

This project involved us successfully clearing a heavily silted culvert, located within a restrictive and difficult-to-access area.

Learn More
culvert clearance
Pennine Way

Pennine Way Recreational Ground

This project involved us successfully completing a project to address surface water accumulation at a recreation ground in Chandler’s Ford. The aim of the project was to ensure that the ground remains accessible and safe for community use, even during periods of heavy rainfall.

Learn More

Transportation and Lifting Operations for Seismic Research Structure

This project involved us carrying out the transportation and lifting operations for the installation of a seismic research structure on behalf of our client.

Learn More
seismic lifting project
vessel removal

Portchester Vessel Removal

This project involved us undertaking the dismantling and removal of an abandoned vessel on Portchester shore.

Learn More

Design and installation of concrete plinth for generator at Basingstoke Hospital

This project involved us undertaking the design and installation a new concrete plinth for a 16t generator at Basingstoke Hospital, as well as the removal of the existing generator.

Learn More
Basingstoke hospital