In March 2026, A R Banks Ltd returned to West Sussex to continue the coordinated marine and shoreline recovery operation following the Baltic Klipper incident.
Learn More
In December 2025, A R Banks Ltd was appointed as Recovery and Salvage Contractor for the beachside recovery of multiple 40-foot shipping containers lost during the Baltic Klipper incident.
Learn MoreWe recently completed a generator exchange at a pumping station in Hampshire, removing the retiring generator and replacing it with a new one.
Learn More
We recently completed a comprehensive earthworks and ground preparation project for a residential client in Hampshire, tailoring a solution to meet their needs.
Learn MoreThis project involved us successfully clearing a heavily silted culvert, located within a restrictive and difficult-to-access area.
Learn More
This project involved us successfully completing a project to address surface water accumulation at a recreation ground in Chandler’s Ford. The aim of the project was to ensure that the ground remains accessible and safe for community use, even during periods of heavy rainfall.
Learn MoreThis project involved us carrying out the transportation and lifting operations for the installation of a seismic research structure on behalf of our client.
Learn More
This project involved us undertaking the dismantling and removal of an abandoned vessel on Portchester shore.
Learn MoreThis project involved us undertaking the design and installation a new concrete plinth for a 16t generator at Basingstoke Hospital, as well as the removal of the existing generator.
Learn More